ROUTER:
Slack: 8:47pm "started a side extrusion and the router went to the wrong first position....... So right now we're machining a part"
This would be the CZ_19_01001 side extrusion for the DT.
Slack (1/29/18) 10:21am: "How many parts were run last night?..."
Slack (1/29/18) 10:49am: "I think we almost ran an entire face of a part, but we're ultimately stopped by T1 breaking."
so, supposing 0.25 of (01001) out of 4 total to do. Now up to 2.25/4 done. Guessing each takes 1 hr.
(routing by: Thomas P, Zack H., James, Edan)
In Slack, crazy amount of stuff going on... for posterity, would be good to detail here...
-