Drivetrain 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/9/2014

  • 3 hours

  • Parkland Shop

  • Lyle R.


Work Completed

We talked with shooter, feeder about dimensions and concluded that we will make it 21 by 34 inches with two mecanum wheels on the 34 inch sides. We considered putting the wheels on the shorter side and shooting towards the side of the robot, but we concluded that this would make the robot too liable to overbalancing. We considered making a frame out of sheet metal but we have not decided if we will do this or do an 80/20 frame. We finally concluded that we want to attempt shiftable custom gearboxes. We will most likely only put one motor per wheel.

Work for Next Meeting

research gear ratios and options for building the gearboxes. We will need Tom to help us with the actual parts to order and he is coming on Sunday. Aradhana plan to come tomorrow from 2-4.

On Schedule?

we are doing fine