Work Completed
Continued assembly of the initial drivetrain bot. Drilled holes in the gearbox frame to attach them to the base plate and the 80/20. Created new 80/20 pieces that attach the base plate to the 80/20 chassis independently from the gearboxes(two have been tapped at one end.