Edit

Note Viewer


Drivetrain 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/8/2014

  • 3 hours

  • Parkland Shop

  • Brendan P.


Work Completed

Continued assembly of the initial drivetrain bot. Drilled holes in the gearbox frame to attach them to the base plate and the 80/20. Created new 80/20 pieces that attach the base plate to the 80/20 chassis independently from the gearboxes(two have been tapped at one end.

Challenges

No significant challenges

Work for Next Meeting

Finish the assembly of the drivetrain, i.e. finish tapping the 80/20 connectors and fully attach the gearboxes to the base plate and chassis and reassemble them.

On Schedule?

Behind schedule