Edit

Note Viewer


Drivetrain 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/29/2014

  • 3 hours

  • Parkland Shop

  • Brendan P.


Work Completed

Completed the initial assembly of the drivetrain. Things to still be done: create a base plate made of sheet metal and attach it, attach the 5 inch pieces to the base plate, determine if the wheels are on correctly

Challenges

None

Work for Next Meeting

Look into if the wheels are on the robot correctly and finalize the base plate

On Schedule?

back on schedule