Edit

Note Viewer


Drivetrain 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 2/1/2014

  • 4 hours

  • Parkland Shop

  • Brendan P.


Work Completed

Made a CAD representation of the robot and uploaded it onto drive with the necessary parts. Ironed on the numbers and made the blue set of bumpers

Work for Next Meeting

Create the red set of bumpers if the material is here. Start assembly on second bot: i.e. add wheels to the gearboxes, attach the gearboxes to the drivetrain, attach the 5 inch support beams to the base plate.

On Schedule?

on schedule