Edit

Note Viewer


Drivetrain 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 2/5/2014

  • 3 hours

  • Parkland Shop

  • Brendan P.


Work Completed

assembled the gearboxes on the chassis of the practicebot

Challenges

We have three different widths for the drivetrain base plate. The one on the robot, the second wooden plate that controls is working with, and the CAD design. We need to find out which is correct.

Work for Next Meeting

Finish assembling the practice bot address the issue of why the drivetrain plate is a different width in CAD than on the robot

On Schedule?

Almost on schedule. need to make a decision on what the width of the base plate is.