Edit

Note Viewer


Drivetrain 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 2/11/2014

  • 3 hours

  • Parkland Shop

  • Lyle R.


Work Completed

fixed the gearbox on the final chassis that wasn't turning and attached the jaguars to the wooden base plate. We also figured out the dimensions that the lexan plate will be cut down to. We figured out where we will be wanting the holes on the lexan plate to mount to the machined plate, and concluded that we will not want the laxan plate mounted using the same screws that fasten the machined plate to the gearbox. The design is on a sheet of lined paper on the electrical table.

Work for Next Meeting

cut/drill the electrical plate WITH ASSISTANCE FROM ELECTRICAL (we dont want to break their stuff). if the machined plate comes in, drill holes and mount it.

On Schedule?

we are running out of time and are hoping for the machined plate to come in soon.