Control Systems 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/27/2014

  • 3 hours

  • Parkland Shop

  • Nolan P.


Work Completed

Finished mounting all the electrical parts on the ghettobot plate so we can attach it to the real frame. Built a mock up of the control pane with most of our bottons. We are still waiting on a few parts but everthing has been ordered. Got a few more patterns working on the LED strip.

Challenges

We are unsure of the measurements where the frame will attach to the plywood plate.

Work for Next Meeting

Finish integration between drivetrain and our electrical system. Hopefully get the whole ghettobot driving tomorrow. Thomas needs to start working on Labview to see if he can take the inputs from the Cypress and get our code to recognize them. Finish the chaser program on the LEDs

On Schedule?

We are on schedule but because of the other subteams not getting their things built, we haven't been able to integrate.