Edit

Note Viewer


Catcher 2014

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/14/2014

  • 3 hours

  • Parkland Shop

  • Mikhail S.


Work Completed

PVC Prototype built for tomorrow's meeting. Rope pass through used in prototype to allow lowering wings off of the sides of the vertical bars to make sure that the most possible area is covered by the catcher.

Work for Next Meeting

Fix problem with lowering wings.

On Schedule?

Everything on schedule.