Edit

Note Viewer


CAD 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/8/2015

  • 3 hours

  • Shapland Stronghold

  • Jay S.


Work Completed

Today we partially CADed and assembled the Grabber, but were stopped in the middle because od design changes because they didn't want the pistons to be load bearing. We got the piston assembly done, with the piston attachment, clevis, grabber plate, and piston plate (which connects to the piston face and interfaces with the lifter slider thing.)

Challenges

The work might become useless because the design might change alot.

Work for Next Meeting

We need to check back with the subteams and see if they know what they're doing.

On Schedule?

Yeah I think so.