Lifter 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/12/2015

  • 3 hours

  • Shapland Shop

  • Joaqui'n M.

Guests

jack


Work Completed

Today we deliberated for a long time. There was a large group meeting at the beginning where we combined with the grabber subteam and discussed the new design for about half an hour before everyone understood the basic concept of the new design so that we could break into our respective subteams to design our own parts. We worked on dimensions for a while and finalized our design with a length of 10" and a width of 3.625". The rest of the time was spent coordinating our efforts with grabber.

Challenges

So many changes and so much inetgration made finalizing dimensions very difficult.

Work for Next Meeting

Use the new dimensions to finalize design and give it to Jay for CADing.

On Schedule?

Yes