We made a list of all the things that we are going to get soon, and all the things we still need to buy. We also made a plan for what we need to do when the parts come. We added a plus gusset and some c channel to our BOM and when all the stuff comes, we are going to build a working prototype of our apparatus, attaching the piston to a piece of wood, creating the 80.20 struts and sliders, and attaching it to joaquin's linear bearings. We also worked on the proof of concept a bit today, creating a little design for what we can do (basically a simple apparatus that attaches to slider/cchannel and with 80/20 struts that don't slide).
nothing too significant
work on creating engineering-ready drawings of our machined part, and order anything else we still need (if something comes up)
yeah