Edit

Note Viewer


Lifter 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/20/2015

  • 3 hours

  • Shapland Shop

  • Joaqui'n M.


Work Completed

Today Justin and WIlliam continued to work on the prototype to get it almost into working condition. All of the pulleys are mounted and ther wire is cut for the lifter but there are no t nuts for grabber -____-. We also had a lot of redesign and stuff to try to cut the weight. we ended up removing the back plate and there is now some cable that stretches across the back of the bot at the top..

Challenges

Still not a lot for people to do. Awaiting parts. Need to get CAD and full engineering drawings as well.

Work for Next Meeting

  hopefully get parts. finish prototype. continue any CAD and engineering drawing work that needs to be done.

On Schedule?

idk i think so