Drivetrain 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/20/2015

  • 3 hours

  • Shapland Shop

  • Lyle R.


Work Completed

We worked on how to connect the two towers. The back plate was way to heavy. We are now doing 2 1/16 inch side plates per side

Challenges

The side plate lightening holes are slightly messed up and the tower strengthening still needs to be worked out. The largest challenge is the weight.

Work for Next Meeting

figure out the side plate design

On Schedule?

we are falling behind.