Edit

Note Viewer


Drivetrain 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/21/2015

  • 3 hours

  • Shapland Shop

  • Brendan P.


Work Completed

Rounded side plates, changed holes that do not line up to 0.21 or 0.16 varying by how far off the holes were, worked on final assembly, placed mobil synthetic red grease on the BOM, the grease is in a canister and therefore a grease gun will be needed, the 3/16" steel rivets were received.

Challenges

None

Work for Next Meeting

Finish assembly as well as back plate and begin work on engineering drawings

On Schedule?

Yes