Edit

Note Viewer


Grabber 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/24/2015

  • 3 hours

  • Stronghold

  • Kavi N.


Work Completed

We worked more on assembling our apparatus. We used the chop saw to cut 80/20 into 5.5 and 5.25 inch segments, 8 of each. We grinded and deburred the edges to make them useable, and attachted them to our sliders. We now have 4 completed slider and 80/20 mounting things. Also we tested the pistons. We did strength testing with the prototype on the totes (using old pistons). 20psi is enough to lift containers and totes and with 30psi you get 2.5 cycles per tank with two pistons. 

Challenges

it's a pain to cut and stuff

Work for Next Meeting

work on engineering drawings for machined parts, possibly buy more metal for plates.

On Schedule?

yeah