Drivetrain 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/25/2015

  • 3 hours

  • Shapland Shop

  • Mikhail S.


Notes

The top plate of the drivetrain has two versions, one 3D and one flat used for the engineering drawing. 

Work Completed

Mikhail CADed the two front wedge plates that cover up the front of the drivetrain chassis.

Lyle finished the engineering drawings minus the 2 new plates Mikhail made. In addition he made all the cdimensions fractions to hide the discrepancies we have witht the part sizes.

We ensured that all the holes that didn't line up were .16" in diameter instead of the .196" needed for the hole, so we will widen out all the holes once the drivetrain comes.

Challenges

Creo being stupid as usual.

None of the holes lne up, so we're going to go with the smaller holes and then drill them out route. 

Figure out how we are going to be mounting the front wedge plate.

 

Work for Next Meeting

Complete all the engineering drawings and check that everything is correct. Check that all the parts we have in the assembly are correct and 

On Schedule?

A bit behind schedule. We should have been done with everything by now, but we aren't, but should be ready to send the files to Wagner very soon.