Edit

Note Viewer


Frisbee Bot Refurbish 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/27/2015

  • 3 hours

  • Atkins

  • Philip W.


Work Completed

Attached and loctited 3 sides to the frisbee bot. One gearbox is attached.

Challenges

didnt look at wiring before attaching stuff gearbox wires ended up on the wrong side took time to fix 80/20 nuts suck

Work for Next Meeting

finish the sides and loctite all of the 80/20 connectors start on attaching top

On Schedule?

sure thanng