Gus K., Singer, Mikhail S.,
Gus started assembling the 2nd grabber platform which required making a ghetto slider. The wood base is cut and ready to have holes drilled through it to mount the grabber slide. Gus also found spring coiled pneumatic tubing for the pistons. Maia installed a supporting 80-20 beam on the back of the lifing platform. Maia assisted Mikhail in attatching a Cim + Rawbox to the pulleys. Robert also did stuff. Singer helped Maia install the 80-20 and cleaned up with Gus.
It was discovered that the snap rings on the RAWboxes pop off, which is a potentially huge problem if it occurs in a game.
Finish the ghetto platform. Clean. And work on gear box solutions
....sure....