Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 2/7/2015

  • 10 hours

  • Shapland Shop

  • Aradhana S.

Guests

Jayasurya - The victorious sun


Work Completed

  • Assemble both the grabber except the top plate
  • We cut off a quater inch off the piston plate so the top plate could reach the piston shaft. At first, the 8020 sliders were extended too far out, so the top plate could not reach the piston shaft 
  • We meaured and drilled the sea channel and attached the plus gussets to them and attached them to the grabber
  • We also cut one inch from two sides of each gusset so that it would be easier to work with 
  • We helpedlifter with their lifts for some time

Challenges

  • We attempted to create two top plate but both kinda half-failed or maybe even failed... SOOOOOO, the 8020 holes are figuratively impossible to place on the top plate
  • We tried a bajillion+ times and bajillion checked all the measurements before drilling the holes

Work for Next Meeting

  • Figure this shit out, man
  • Find a way to drill the holes in the right place on the top plate so that it matches with the inside hole of the 8020 (the one that slides in and out)
  • ASK MIKE FOR HELP 'CAUSE HE MIGHT KNOW THIS DOOKIE

 

 

On Schedule?