Edit

Note Viewer


Electrical 2015

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 2/7/2015

  • 10 hours

  • Shapland Shop

  • Nolan P.


Work Completed

Finished flipper code. Wired and re-mounted everything on our plate. Got underglow LEDs working on the drivetrain. Helped assemble mech lifter and some drivetrain parts. Looked over auto code and picked the 2 strategy options we want. Made an IO spreadsheet on drive for all of our signal wires. Made extensions and started wiring drivetrain. Wrapped cables and tried to stuff them through the miniscule slots we had for wire space.

Challenges

Not enough space for our wires in drivetrain. Main laptop passed away. RIP.

Work for Next Meeting

Get new driver station laptop loaded and ready for programming and driving. Finish autonomous code. Get tower and electrical plate wired and mounted.

On Schedule?

Not quite