Electrical 2016

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Sarah H.

  • 1/19/2016

  • 3 hours

  • Shapland Shop

  • Isaac F.


Work Completed

  • We discussed with mechanical on the turret vs mecanum alignment for shooting
  • We oversaw sigalov's testing of mecanum rotational precision
  • We got an ultrasonic sensor working
  • We created a bom for electrical of 2 robots
  • We created a document for communication between other subteams and electrical

Challenges

Alexandre pulged in some wires wrong

A ground wire was severed

we temorarily misplaced an ultrasonic sensor

Work for Next Meeting

  • Configure new wireless router for shop, then replace existing one.
  • Get a contact switch working in Python robot code.  Just verify we know how to aquire those values in the code.
  • Talk to mecanical about having a encoder on their shooter [is this done?]
  • Fix cable on celling
  • Help with making field elements
  • Comunicate GRIP from roboRIO to DS
  • Deploy GRIP code to roboRIO or Jetson
    • Find the IP by using traceroute or connect straight to the roboRIO through ethernet and just go for it with IP 172.22.11.2.
  • Work on RGB LEDs

On Schedule?

sure