Edit

Note Viewer


Electrical 2016

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Adam P.

  • 2/1/2016

  • 3 hours

  • Shapland Shop

  • Alexandre G.


Work Completed

-Thomas put on headphones and “Listened to pretty noises”

-Isaac reinstalled everything on Alpha pi and is writing a guide on drive

    -Isaac got DNS stuff working on Beta Pi 

    -new address is beta.local

    -connects to roborio on roborio-4096-frc

-Tried to get widgets to show up on the Smart Dashboard

-Got deploy working again after roborio update. Needed to add "--no-version-checks" option to deploy command-line in Wing script

-Nolan deburred

-Nolan talked to Jack and got a new list of controls needed. 

- Adam finished spinning up second DS laptop.

Challenges

-Great color war (Feb. 1, 2016 - present day) a sad period for the team, our country and the world.

-Smart Dashboard is confusing and we need to find out how to print information to it

Work for Next Meeting

  • Find way to measure cpu load on Pi.  If load looks agreeable with GRIP running full tilt, we can return Jetson.
  • Get GRIP file to deploy like robot code, from DS->Pi, likely via PSCP & upgrades to our fancyier Wing script
  • Get mjpeg-streamer & GRIP to run when robot code starts, die when disabled or match over
  • Find good settings for mjpg-streamer
    • keep optimizing
  • Outline new robot code, using WPI commands style
  • Get second RPi spun up and tested with GRIP, mjpeg-streamer, etc. for practice bot
  • Check on spike supply and maybe order more
  • Look for velcro to buy thomas want various strengths/sizes
  • Help with making field elements
  • Work on wiring of RGB LEDs
  • Fix Thomas' mistakes
  • Look at Nolan's new and improoved controls list

On Schedule?

“Stay Strong" -Thomas and the internet