Edit

Note Viewer


Electrical 2016

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Sarah H.

  • Adam P.

  • 2/16/2016

  • 3 hours

  • Shapland Shop

  • Caleb P.


Notes

"Sarah, and Ha" helped us

Work Completed

  • Wrote code for raising/lowering shooter and starting shooter wheel
  • Wiring started on competition bot
  • Shitty soldering done on practice bot
  • mild changes to code: removing gyro for now and flipping joystick axes

 

Challenges

THOMAS

Work for Next Meeting

  • Continue robot code, test shooter/elevation.  Write code for indexer.
  • Finish wiring competition bot
  • Find best way to see/modify camera settings.  Play with brightness/exposure/etc. to get the best isolation of targets in imagebefore GRIP gets ahold of the stream.  Then adjust GRIP file to make the best use of that.
    • On some websites, they connect the video to the HSV filter twice so that there are two intervals for each. Might want to check this out.
  • mjpeg-streamer & GRIP can now start when Pi boots, still need to SSH in and shutdown nicely when disabled or match over.
  • Find good settings for mjpg-streamer (Look into the fork)
    • keep optimizing (It seems that brightness and contrast being near zero works extreemly well
  • Get second RPi spun up and tested with GRIP, mjpeg-streamer, etc. for practice bot
    • Catch Beta up to Alpha Pi 2.
  • Check on spike supply and maybe order more
  • Work on wiring of RGB LEDs
  • Look at Nolan's new and improved controls list

On Schedule?

eh