Edit

Note Viewer


Electrical 2016

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Sarah H.

  • Adam P.

  • 2/20/2016

  • 3 hours

  • Shapland Shop

  • Alexandre G.


Work Completed

  • Sarah wired some stuff.
  • Adam split shooter and feeder into elevation/action subsystems, wrote a new class that treats joystick's POV switch like 8 buttons.
  • Alexandre looked at the code that has been done over the past week and might make some changes later in the day.
  • [yesterday] Nolan split indexer into separate subsystem

Challenges

-There is probably more for challenges and work done, but I was only here for a little while.

Work for Next Meeting

  • Continue robot code, test shooter/elevation.
  • Work on vision processing
    • Faster this is done the more testing we can do with the shooting
  • Finish wiring competition bot
  • Get camera feed visible on driver station.  Can probably use new GRIP plugin for SmartDashboard
  • Find best way to see/modify camera settings.  Play with brightness/exposure/etc. to get the best isolation of targets in imagebefore GRIP gets ahold of the stream.  Then adjust GRIP file to make the best use of that.
    • On some websites, they connect the video to the HSV filter twice so that there are two intervals for each. Might want to check this out.
  • Need to SSH in and shutdown Pi nicely when disabled or match over.
  • Find good settings for mjpg-streamer (Look into the fork)
    • keep optimizing (It seems that brightness and contrast being near zero works extreemly well
  • Get second RPi spun up and tested with GRIP, mjpeg-streamer, etc. for practice bot
    • Catch Beta up to Alpha Pi 2.
  • Check on spike supply and maybe order more
  • Work on wiring of RGB LEDs
  • Look at Nolan's new and improved controls list

On Schedule?

Probably behind... only 3 days left!