Edit

Note Viewer


Fuel 2017

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • 1/17/2017

  • 3 hours

  • Shapland Shop

  • Isandro M.


Work Completed

After testing the belt agitator mechanism we built a shooter wheel apparatus onto the belts to imitate the transition between holding balls and shooting them. 

Challenges

The extra gears and fly wheels were very heavy and were somewhat difficult to attach. 

Work for Next Meeting

Attach a wheel in from the of the shooter wheel (an index wheel) to determine the amount of balls feeding to the shooter and the speed. After that, finish attaching the curved lexan plate as the fixed angle and begin testing.

On Schedule?

Behind