Edit

Note Viewer


Drivetrain 2017

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Anna O.

  • Mayank H.

  • Shashank H.

  • Chris E.

  • 2/21/2017

  • 7 hours

  • Shapland Shop

  • Ha T.


Work Completed

Not much to be done with the drivetrain except installing springs onto the strafe module

Challenges

Tedious task, took a couple hours to put in 4 springs because the working space was so tight

Work for Next Meeting

Organize all the parts: put all packages in one place, and collect all loose parts into a container for sorting. Go through the drivetrain BOM and verify where each part is, if needed.

On Schedule?

yea