Edit

Note Viewer


CAD/Design 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • David S.

  • Dina H.

  • Lawrence Z.

  • Mayank H.

  • Sarah H.

  • Shashank H.

  • Adam P.

  • Sue K.

  • 1/14/2018

  • 3 hours

  • Aquiferland

  • Sarah H.


Work Completed

Sarah - Drivetrain fixes

Lawrence - Researched FRC ramp designs and outlined the pros and cons of our current ramp design and the pros and cons of a RI3D design.  Started sketching the double ramps (on a piece of paper due to my computer running out of battery) with dimensions.  Waiting for ramp team to come up with more numbers about the power of the piston, the width of the ramp, etc.

Mayank-

Shashank-

Challenges

computers

Work for Next Meeting

1. CAD drivetrain assembly needed

2. lifter and feeder (mayank and shashank) sat-wed

3. ramp (dina, lawrence, or david) sat-wed

On Schedule?

kind of