Edit

Note Viewer


CAD/Design 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Dina H.

  • Mayank H.

  • Sarah H.

  • Shashank H.

  • Adam P.

  • Billy D.

  • Chris E.

  • Sue K.

  • 1/15/2018

  • 3 hours

  • Aquiferland

  • Sarah H.


Work Completed

Some drivetrain CAD- Final should be done wednesday

some elevator and feeder design based on second prototype

Challenges

2016 version of solidworks not 2017 = incompatible parts

Work for Next Meeting

1. CAD drivetrain assembly needed

2. lifter and feeder (mayank and shashank) 

3. ramp (dina, lawrence, or david)

On Schedule?

should be done before router comes