Electrical 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Edward K.

  • Lawrence Z.

  • Noah B.

  • Adam P.

  • 1/30/2018

  • 3 hours

  • Aquiferland

  • Armeen M.


Work Completed

  • Cleaned up the "basement mess".
  • Started building switch.
  • Fixed Poly drivetrain.
  • Updated robotpy on Poly and robotpy on DS2.

Challenges

  • Fixing the drivetrain.
  • Cleaning.

Work for Next Meeting

  • Finish rotate 90.
  • Test out LEDs for the robot.
    • Arduino over I2C (Armeen has code for this).
    • Raspberry Pi if Arduino is deemed bad for whatever reason.
  • Switch Poly "drive distance" to PID (info coming from Adam).
  • Assemble field elements if Kyle's dad drops off parts.
  • Take hardware from a bad 2015 battery for the third battery.

On Schedule?

Exuberantly.