Electrical 2018
Students
Mentors
Date & Time
Location & Author
Edward K.
Adam P.
Aquiferland
Armeen M.
Work Completed
- Fixed up rotate for Poly.
- Changed up the PID (D value still needs some tuning).
- Setup WiFi router downstairs via ethernet to retire the repeater.
Challenges
- Tuning PID.
- Getting the router to cooperate.
Work for Next Meeting
- Switch Poly "drive distance" to PID (info coming from Adam).
- Fix up third battery.
- Take hardware off old and low-quality battery or use new hardware(?).
- Finish LED work with Arduino.
- Assemble field elements if Kyle's dad drops off parts.