Work Completed
- rivet treads onto wheels
- there are 8 wheels done (+1 almost done), need 12 total for 2 bots
Challenges
- the tread on one of the wheels was put on too near the bolt, rivet can't go through
- no one wuz here :'(
Work for Next Meeting
- rivet treads on all the wheels
- there are only three 3.67" shafts & three 4.05" shafts cut and tapped that I see on the table. we need four of each type for 2 robots. Maybe the rest are laying around on one of the tables, if not, they need to be made
- one 4.05" shaft is cut, just needs to be tapped. is currently on table w/ wheels & arbor press
- attach wheel hubs onto wheels
- assemble bearing blocks