Mechanical - General 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Anna O.

  • 2/11/2018

  • 3 hours

  • Aquiferland

  • Ha T.


Work Completed

  • Assembled 1 WCD gearbox. Realized we ordered the wrong type. Ordering longer standoffs, bolts, shafts & bearings to fix it
  • Assembled outer frame of practice bot DT
  • Drilled 3/16" holes in gussets
  • wheels are done
  • scavenged for hex wheel hubs. found 3. ordered more.
  • cut 12 x 7.5" extrusions for ramp but they were wrong type (used 2x1 extrusions when they were supposed to be 1x1) but pieces are still usable.
  • also cut 3 x 36.5" 1x1 1/16" thick extrusions for ramp frame from scraps (the extrusions ordered haven't arrived yet)
  • practice DT side channel cut are uneven ( bc of mirroring issues on router) --> filed out the holes for bearing blocks
  • put bearing blocks on frame. they don't slide super easily so we'll need to loosen the bolts when we want to adjust tension on the chains
  • cut back channel for feeder (19")

Challenges

  • refer to work completed
  • running out of medium size rivets (.126-.25). ordered more. coming.

Work for Next Meeting

  • attach wheel hubs onto wheels
  • start assembling the wheels (put on 18T sprockets (NOT 22T), measure out the chains, etc.)
  • mount bumper pieces

On Schedule?

do pigs fly?

9 days til bag day...