  • Adam P.

  • 2/12/2018

  • 3 hours

  • Aquiferland

  • Ha T.


Work Completed

  • deburred the heck out of the clearance hole for the middle bearing blocks on dt side channels & got the bearing blocks to fit flush with the frame
  • assembled another gearbox (partially)
    • didn't put locktite on the 4-40 screw just in case we need to disassemble
  • electrical is experimenting w/ limit switch at the back wall of feeder to detect when cube is all the way in the feeder

Challenges

  • the router surface was slanted so the belly pan is now scrapped --> the 
    • Mr. Goetting will machine the belly pans instead
  • shaft of feeder prototype wheel dislodged from bearing & fell off of nonadrive --> fixed
  • the tips of all the snap ring openers are broken off --> used dremel to sharpen --> kinda worked but not really...
    • really hard to take off the ring so make sure the correct DOG gear is on the shaft before putting it on!

Work for Next Meeting

  • attach wheel hubs onto wheels
  • start assembling the wheels (put on 18T sprockets (NOT 22T), measure out the chains, etc.)
  • mount bumper pieces

On Schedule?

uhhh...

7 days til bag day and counting