Edit

Note Viewer


Electrical 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Sam K.

  • Adam P.

  • 2/14/2018

  • 3 hours

  • Aquiferland

  • Armeen M.


Work Completed

  • Wired stuff.
  • Added stuff to the BOM.
  • Crimped batteries.
  • Taught Sammyboi how the LED code werkzzzzzzzzzzzzz.

Challenges

xd dere was nun

Work for Next Meeting

  • WIRE WIRE WIRE! Also add the "shelf" thing.
  • Finish up auto modes and try spline stuff.
  • Add dual PID to 2018 robot code.
  • SB stuff.
    • Put latest SB as default launched dashboard for both DSs.
    • Test PID modifiers.
    • Theme it! (we can probably just modify the highlights on the default Material Dark design).
    • Create comp JSON layout.
  • Finish assembling field elements as Kyle's dad drops off parts.
  • Battery names (we need 4 more)?

On Schedule?

HA

HA
HA
HA

gud meme