Mechanical - General 2018
Attendance
Note Info
Students
Mentors
Date & Time
Location & Author
Anna O.
Ethan C.
Mayank H.
Shashank H.
Adam P.
Bob S.
2/14/2018
3 hours
Aquiferland
Ha T.
Work Completed
put wheel hubs on wheels
wheels on practice drivetrain
measured and cut chains
measured and marked lexan to be cut for ramp
cut shafts for feeder
all the ramp extrusions are cut and filed, need to be labeled
Challenges
not enough master links --> need to order more (only have 3 in shop)
didn't have screws in shop for wheel hubs, Adam bought some 8-32 from Home Depot
Work for Next Meeting
tap feeder shafts for 1/4-20 bolt
construct comp dt when back channel is done machining
when Chris gets 3D printed 3/8" hex spacers for gearboxes assemble those, put locktite on the 4-40 screws and run them then mount onto dt
assemble belly pan when it arrives
assemble elevator sliding blocks when the machined plates arrive
mark & drill holes in ramp extrusions when conecting pieces are done machining
cut lexan for ramp & feeder
On Schedule?
the schedule isn't real
time isn't real. nothing is real. we're all a simulation.
- elon musk