Edit

Note Viewer


Mechanical - General 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Anna O.

  • Ethan C.

  • Mayank H.

  • Shashank H.

  • Adam P.

  • Bob S.

  • 2/14/2018

  • 3 hours

  • Aquiferland

  • Ha T.


Work Completed

  • put wheel hubs on wheels
  • wheels on practice drivetrain
  • measured and cut chains
  • measured and marked lexan to be cut for ramp
  • cut shafts for feeder
  • all the ramp extrusions are cut and filed, need to be labeled

Challenges

  • not enough master links --> need to order more (only have 3 in shop)
  • didn't have screws in shop for wheel hubs, Adam bought some 8-32 from Home Depot

Work for Next Meeting

  • tap feeder shafts for 1/4-20 bolt
  • construct comp dt when back channel is done machining
  • when Chris gets 3D printed 3/8" hex spacers for gearboxes assemble those, put locktite on the 4-40 screws and run them then mount onto dt
  • assemble belly pan when it arrives
  • assemble elevator sliding blocks when the machined plates arrive
  • mark & drill holes in ramp extrusions when conecting pieces are done machining
  • cut lexan for ramp & feeder

On Schedule?

the schedule isn't real

time isn't real. nothing is real. we're all a simulation.

- elon musk