Edit

Note Viewer


Mechanical - General 2018

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Adam P.

  • 3/22/2018

  • 3 hours

  • Bermuda Basement

  • Ha T.


Work Completed

  • drivetrain functional
  • intake arms, back channel & pistons assembled
  • intake rotation bracket & gear attached

Challenges

  •  

Work for Next Meeting

  • dt
    • switch out back wheels for omnis
  • intake
    • mount rotation motor
    • make lexan back channel from 020 or 030 lexan
    • put 3d printed rotation brackets on back channel
    • slide tube on
    • wire
  • elev
    • put chain on top 18t sprocket
    • tension chain & rope
    • mount constant force spring
  • mount limit switches on elev bottom & intake, pot on intake rotation motor
  • remake bumpers
  • return ramp pistons
  • make a climber
  • get $$$
  • testing (need updating)
    • does PID for elevator work as expected, dosn't slam it up or down, and doesn't over-accelerate? (<- for programming)
    • actual time for elevator to go full height & back
    • time takes for entire lifting routine (get on platform, deploy ramp, other robot climbs on, lift)
    • dt speed?
  • Make buttons
  • Make awards to give other teams?

On Schedule?

are we ever?