Edit

Note Viewer


Hatch 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Sarah H.

  • Adam P.

  • 1/6/2019

  • 3 hours

  • Aquiferland

  • Sarah H.

Guests

James


Work Completed

Notes Feedback:

  • agreement made with drivetrain about the horiztonal elevator/ horiztonal accuracy element of the hatch component
  • Going to made a google drive folder with pics of sketches and vids of testing

Today the #1 prototype was finished in a bare bones form(it's currently proof of concept but needs to be modified further)

  • We did a little bit of testing and more needs to be done next meeting

 

 

Challenges

The pneumatics leaked a lot and we spent a lot of time fixing some components 

Work for Next Meeting

Jobs for Prototype #1 "ID Bolt Grasp"

(Ask James If Sarah is not there for clarification if you want to finished/do the task)

Need to rezip tie

Need to attach on atlas-z

Might want to 3D print the parts instead of usings the bolts and add some more reinforcement/cushion to the bolts 

Other Tasks

Build the pratice hatch if it is routed

finalize the sketch for prototype 1

Record and discuss pros and cons and modify prototype based on testing data

If done with first prototype do the recycle rush design prototype

Test how much wiggle room we have with the velcro and if we will need a sideways elevator mechanism to align better

 

On Schedule?

yes