Hatch 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Adam P.

  • 1/15/2019

  • 2 hours

  • Aquiferland

  • Mayank H.

Guests

Marlow and James


Work Completed

• Began work on petal design

    - Create 3 individual petals

    - Created pieces for the petals to rotate on

• Presented previous designs in team meeting, along with current design

Challenges

• Not enough people/time to do elevator
• New challenge of the petals may not being able to rotate due to force of bent plastic

Work for Next Meeting

Beak Mechanism

• Create prototype for beak/petal mechanism
• Test prototype
• Present design of beak mechanism at team meeting

Horizontal Slide

• Test the current horizontal slider (try with drill for slower speeds)
• Adapt the current prototype to create the latest design (see Tori's drawing on the drive or Slack)

Other Tasks

Record test data

Go through all designs and make sure every single one is on the drive

Record and discuss pros and cons and modify prototype based on testing data (We have pros & cons but now we need to record data for tests for multiple prototypes that we have considered to be our best designs).

If done with the first prototype, sort and rank the remaining designs, and create prototypes for the best.

Begin thinking about which prototype we want to begin building/further testing.

On Schedule?

On the beak mechanism, yes.
We need to get more done on the elavator design.