Dicussion about priorites for the subteam and the work that needs to be done asap
solving unsolved problems
1. We need to clean up the white board sketch(get this done by 1/18), but CAD should start cadding everything
2. We need to determine the pistons we are going to use and order them asap because shipping takes forever(get this done by (1/18)
3. We need to stop designing and start putting manpower to building the drivetrain(e.g. cut drive shaft, cut tread etc) (ask solo for jobs for drivetrain if you run out of things to do)
as long as we adhere to the timeline in the work for next meeting, yes