Edit

Note Viewer


Climber 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Daniel M.

  • 1/17/2019

  • 3 hours

  • Aquiferland

  • Daniel M.


Notes

Edan actually took these notes, there was no option for his name in the dropdown

Work Completed

  • We finished the extensions for the motor controller cables
  • We tested the stilt with the load ( With the load the motor backturned and the speed in the smart dashboard was probably inacurate)
  • we re-tested without load in the vertical position
  • We worked with electrical to try to fix the smart dash shooter speed but were unsuccessful

Challenges

  • With the load the motor backturned
  •  the speed in the smart dashboard was probably inacurate, as in it wasnt an rpm input

Work for Next Meeting

find a way to brake the motor so it doesnt  backturn and wreck itself

try to get cad for full design

 

On Schedule?

We should still be able to finish on time, but we will need to find a way to implement a brake system.