Edit

Note Viewer


CAD & Integration 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Chris E.

  • 1/18/2019

  • 3 hours

  • Aquiferland

  • Aryan L.


Work Completed

Finished CAM files for sides one and two of both the side and back extrusions of the drivetrain. Started on the sheet metal assemby for the three gearbox plates and got through setting up plates, boring screw holes and finished adaptives for the first job consisting of five front gearbox plates. 

Challenges

After the adaptives were finished an error appeared: "Failed to export surface from operation". We couldn't figure out how to resolve it. 

Work for Next Meeting

Next meeting we should finish drivetrain CAM files, finalize arm and cargo geometry and finish climber CAD if possible.

On Schedule?

No, we need to finsih the drivetrain CAM as soon as possible.