Drivetrain 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Nhan T.

  • 1/22/2019

  • 2 hours

  • Aquiferland

  • Michal O.


Work Completed

We continued assemblying the drivetrain today. All the sides are attached and we started to attach the wheels. We discovered that there are 3 different length of shafts instead of two. We cut new shafts and threaded them. Additionally, we discovered that one of the front wheels were badly made that cause one side of the front wheel to touch while the other doesn't. We removed the rivets from the wheel and rerevited them.

Challenges

We are currently waiting on the pinions, and the gearbox plate for the gearbox. There isn't much we can do besides fix the errors till those are finish. 

1) I don't think there is Loctite on the screws.

2) Nobody measured right angles while assembling the frame. We checked it afterwards with Ethan and it is OK (I'd say the frame is skewed less than 0.5 mm)

 

Work for Next Meeting

 

  • route gearbox
  • assemble said gearbox
  • add gearbox to frame

On Schedule?

No, because drivetrain were due 1/20/2019.