Edit

Note Viewer


Drivetrain 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Nhan T.

  • Sarah H.

  • 1/27/2019

  • 3 hours

  • Aquiferland

  • Solomia D.

Guests

+ Ethan


Work Completed

- deburred gb plates

- pressed bearings into plates

- assembled almost two gearboxes

Challenges

- motor clearance hole didn't get sanded out, which was discovered pretty late into assembly

- low manpower - I ended up assembling both gearboxes, so it took me a pretty long time

- no cad on laptoops -> I was forced to assemble by the cad computers

Work for Next Meeting

assemble the gearbox and add gearbox to frame

replace bolts on wheels (and locktite them)

put hubs on comp wheels

On Schedule?

on schedule to finish DT1 tomorrow