CAD & Integration 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Dina H.

  • 1/27/2019

  • 3 hours

  • Aquiferland

  • Dina H.


Work Completed

For some of the time we helped assemble the gearbox. We also were able to finalize geometry for the cargo mechanism. The frame and wheels were assembled for cargo CAD. The arm for the cargo mechanism was almost completely completed except for one section. Some work was done for the front connector exrusion for the carrage, and gussets to connect the climber to the drivetrain frame were started. 

Challenges

Since there were touch sensors on the side of the climber, the gussets had to be designed to go around them, which proved to be challenging. Dimensioning was also a problem because we needed it to be structually sound but at the same time not interfere with any other parts. 

Work for Next Meeting

The final section for the arm of the cargo mechanism should be completed. The gussets for the climber should also be completed. Climber CAM should be worked on and finished if possible. 

On Schedule?

Yes, we should be on schedule to finish CAD by February first.