CAD & Integration 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Dina H.

  • 2/3/2019

  • 3 hours

  • Aquiferland

  • Dina H.


Work Completed

The gearbox for the cargo arm was started. All gear ratios were determined using JVN calculator, and two plates for the gearbox were CADed. The gearbox assembly was also started. 

Challenges

It was challenging to get the gearbox ratios figured out as we had to keep stall and draw power in consideration. 

Work for Next Meeting

We should finish the cargo arm gearbox and work on the hatch mechanism

On Schedule?

We should be done by Wednesday