Assembly 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Chris E.

  • Mike K.

  • 2/6/2019

  • 3 hours

  • Aquiferland

  • Mike K.


Work Completed

ROUTER: 1.0 Climber posts (05001).. by James; 3.75 Climber posts (05001) by Solo; Mike K. Chris E. Bryn backup;

6.25 of 8 climber posts routed by end of session

router was engaged 4.5 hours (shop hours extended past normal close)

Challenges

At start of session the coolant mister wasn't spraying. At some prior point in time the needle-valve regulating the coolant flow had been turned to a shut-off position. Easy fix

Work for Next Meeting

ROUTER: continue routing climber posts(?)

On Schedule?

nope? (how far off?)