Assembly 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Bob S.

  • 1/30/2019

  • 3 hours

  • Aquiferland

  • Mike K.


Work Completed

ROUTER:

Slack: 3:09pm Gussets are running.

Slack: 3:09pm Did the side rails get routed, or are those after the gussets?

Slack: 3:18pm After gussets.

Guessing this is the 12th DriveTrain gearbox plate (+ redo of messed up gearbox plate) + 6 DT gussets

Guessing run time is 1 hour.

Slack: 9:55 T1 still needs to be run on this face, decided to call it a day -- DT side extrusion (01001) pic shows .25 of part done.

Guessing this is the 4th of 4 side pieces, assuming #3 got finished today: so 1 hour run time for 2.25 -> 3.25 side pieces done

 

Challenges

-

Work for Next Meeting

--

On Schedule?

-