Edit

Note Viewer


Assembly 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Sam K.

  • Adam P.

  • Chris E.

  • 2/27/2019

  • 3 hours

  • Aquiferland

  • Solomia D.


Work Completed

- made one of the brackets holding the air tanks flush with our frame perimeter

- worked on practice bot bumpers!

Challenges

none

Work for Next Meeting

 

- full list on the board, but

  • design new cargo arm!!
  • replace slidey bits on the hatch carriage
  • ultra sonic mounts
  • figure out how to tension climber chain
  • cushioning for the light sensor array
  • finish making bumpers

 

things to do at competition:

  • ziptie or chain tensioner needs to be added to the back climber axle bc that chain is loose
  • replace potentiometer ziptie with 4-40 
  • mount Arduino and light sensors
  • mount handles
  • replace leaking 3-way connector 
  • deal with climber wires (they're precariously in the way)
  • put something on bottom of cargo hand so it doesn't touch the carpet (some rubber or something)
  • mount ultrasonic sensors

On Schedule?

yes? we have a schedule?